"Crimean Switch Off"

"Crimean Switch to Off Position"
Robert Brovdi, Commander of USF, 05.07.2026, Telegram channel. · Telegram @robert_magyar, 05.07

Energy campaign of the Unmanned Systems Forces against 330/220/110 kV substations supplying occupied Crimea and adjacent temporarily occupied territories: Kerch, Feodosia, Yevpatoria, Simferopol, Yalta — as well as the "Kuban–Crimea" energy bridge transfer hub. Began 06.07.2026, ongoing indefinitely.

Start 06.07.2026 456 energy nodes from 06.07 as of 03.10.2026 (post №2872) 82 energy nodes for September 2026 (infographic №2863) 374 (09.09) → 412 (22.09) → 456 (03.10) 28.08 — branch "East-Vyo" (Luhansk region) Regions — AR Crimea + TOT + rf (one target: PS "Taman", Krasnodar Krai, 22.08) As of 02.11.2026 · no new values after 03.10
What this campaign is

"Crimean circuit breaker off" — energy vector of the broader campaign "Cutting off Crimea": the circuit breaker is an energy element of an umbrella operation that simultaneously cuts electricity, fuel (maritime "MoLOChKa") and overland logistics of the occupied peninsula. Objective — to deprive the rf grouping and civilian infrastructure of Crimea of external power, immobilizing the "Kuban–Crimea" energy bridge and substation network.

"The Crimean circuit breaker got tired at the 38th... step of the USF Birds. Crimea occupiers admitted blackout of all cities and districts of 'South Coast' and in Simferopol."— Robert Brovdi, 06.07.2026

Sources: Telegram @robert_magyar, 06.07 · Telegram @robert_magyar, 07.07

Throughout July 2026, the USF conducted a campaign against energy infrastructure powering occupied Crimea: the cumulative count of struck energy nodes grew from 44 (as of 07.07) to 164 (as of 29.07); the final figure for the month — 166.

Sources: Telegram @robert_magyar, 06.07 · Telegram @robert_magyar, 07.07 · Telegram @robert_magyar, 29.07

October 2026 — counter status

As of 02.11.2026 the last value the Commander published for "Crimean Circuit Breaker off" is 456 energy nodes from 06.07.2026 as of 03.10.2026 (post №2872, published 04.10.2026). In October this is the only campaign post: +44 energy nodes over 10 days (24.09–03.10.2026) — 17 facilities in Crimea, 14 — TOT Donetsk oblast, 6 — Zaporizhzhia, 5 — Luhansk, one each — Kharkiv and Kherson oblasts.

In the Commander's posts for 05.10–02.11.2026 (№2873–№2950) there is not a single campaign facility list and not a single new counter value.

Sources: Telegram @robert_magyar, 04.10 (post №2872, as of 03.10.2026)

Chronology — week-by-week buildup

USF cumulative count built up by weeks: 44 targets as of 07.07.2026 → 96 as of 19.07.2026 → 166 in the final summary from 01.08.2026 → 349 as of 31.08.2026 (168 for August) → 374 as of 09.09.2026 → 412 as of 22.09.2026 → 456 as of 03.10.2026 (post №2872; for September — +82 per infographic of post №2863). Each point below is a separate statement by the USF Commander.

Week 1 (01–07.07.2026) — start, 44 targets

Campaign publicly named on 05.07.2026: "Minus 16 energy nodes in 48h. Crimean circuit breaker to off position." For 01–07 July claimed 44 struck energy nodes of Crimea and southern part of TOT.

Sources: Telegram @robert_magyar, 06.07 · Telegram @robert_magyar, 07.07

Mid-month (by 19.07.2026) — 96 targets

In a joint summary of operations "MoLOChKa" and "Crimean circuit breaker off" for 01–19 July, the claimed count reached 176 shadow fleet vessels and 96 energy nodes.

Sources: Telegram @robert_magyar, 19.07

July (01.08.2026) — 166 targets, final figure for the month

In the final July summary, claimed campaign count — 166 struck energy nodes; interim snapshot 164 from 29.07.2026 — outdated, replaced by this final figure.

Sources: Telegram @robert_magyar, 01.08 (monthly summary)

August (31.08.2026) — 349 targets, +168 for the month

According to the monthly summary of the USF Commander (01.09.2026), in August 2026 168 energy nodes were struck, cumulatively from 06.07.2026 — 349.

Sources: Telegram @robert_magyar · Euromaidan Press

September, first week (09.09.2026) — 374 targets, +34 for the week

For 01–09.09.2026 claimed +34 energy nodes in Crimea, in the South and East TOT; cumulative from 06.07.2026 — 374.

Sources: Telegram @robert_magyar, 10.09 (for the first week of September)

September, second decade (22.09.2026) — 412 targets, +38 for the decade

For 10–22.09.2026 claimed +38 energy nodes: 10 objects in Crimea, 9 — TOT Donetsk oblast, 13 — TOT Luhansk oblast, 4 — in rf, one each — Kharkiv and Zaporizhzhia oblasts; cumulative from 06.07.2026 — 412.

Sources: Telegram @robert_magyar, 23.09 (for the second decade of September)

Posts №2805 (10.09), №2841 (23.09) and №2872 (04.10) publish the list of USF units engaged in the operation in one consolidated block under the text — without linking to a specific facility: 414th Separate USF Brigade "Magyar's Birds", 412th Separate Brigade "Nemesis", 9th Separate USF Brigade, 20th Separate Brigade "K-2", 413th Regiment "Raid", 429th Separate Brigade "Achilles", 1st USF Operational Center, "Phoenix" State Border Guard (USF grouping), 427th Separate Brigade "Rarog".

September (per infographic of post №2863) — +82 energy nodes for the month

Per infographic to the USF Grouping report (01.10.2026) the "Crimean Switch off" campaign yielded +82 energy nodes for September; the channel's series continues to 456 as of 03.10.2026 (post №2872).

Sources: Telegram @robert_magyar, 01.10 (USF Grouping report for September)

24.09–03.10.2026 — 456 targets, +44 for the period

Declared +44 energy nodes: 17 facilities in Crimea, 14 — TOT Donetsk oblast, 5 — TOT Luhansk oblast, 6 — TOT Zaporizhzhia oblast, one each — Kharkiv and Kherson oblasts; cumulative from 06.07.2026 — 456 as of 03.10.2026.

Sources: Telegram @robert_magyar, 04.10 (for 24.09–03.10.2026)

Cumulative number of declared energy targets, by day (USF, 07.07–03.10.2026)
44839610411713615416416617718720121124024326731534937441245607.0718.0719.0720.0722.0724.0727.0729.0701.0802.0803.0805.0807.0813-14.0816.0822.0828.0831.0809.0922.0903.10 · as of

Sources: TG 07.07 · TG 18.07 · TG 19.07 · TG 20.07 · TG 22.07 · TG 24.07 · TG 27.07 · TG 29.07 · TG 01.08 · Telegram @robert_magyar, 10.09 (for the first week of September) · Telegram @robert_magyar, 23.09 (for the second decade of September) · Telegram @robert_magyar, 01.10 (USF Grouping report for September) · Telegram @robert_magyar, 04.10 (for 24.09–03.10.2026)

Point 03.10 — last recorded snapshot (456 from 06.07.2026, +44 for 24.09–03.10, post №2872).

Distribution of 355 strike map entries by region, July–October 2026 (types "Energy" + "Gas infrastructure"; "Tamanneftegaz" export terminal from 20.08 not included)
AR Crimeapeninsula157Donetsk oblastTOT85Luhansk oblastTOT55Zaporizhzhia OblastTOT35Kherson OblastTOT22Krasnodar Krairf1

Extract from strike map — 355 entries of the "Crimean Circuit Breaker off" campaign for July–October 2026 (162 in July, 104 in August, 49 in September, 40 in October) in the regions of AR Crimea, Kherson, Luhansk, Donetsk, Zaporizhzhia oblasts and Krasnodar Krai (rf); lower than the channel's official count — 456 as of 03.10.2026 (post №2872), because part of the daily summaries was published without object-by-object breakdown (see "Methodology" below).

Named substations

186 substations with proper names from the public USF strike map for July–October 2026 (until 04.10) — extract of the "Crimean Circuit Breaker off" campaign (types "energy" + "gas"; regions AR Crimea, Kherson, Luhansk, Donetsk, Zaporizhzhia oblasts and Krasnodar Krai, rf) from strike map. Each record is a separate claimed target with a link to the primary source.

DateObjectRegionUnitSource
2026-07-08Electric substation PS "Nasosna 3"AR Crimeawith USF participationTG↗
2026-07-08Electric substation PS "Nyzhnyohirsk"AR Crimeawith USF participationTG↗
2026-07-08Electric power transfer point "Kuban-Crimea"AR Crimeawith USF participationTG↗
2026-07-10ES PS 110 kV "Berehove"AR Crimeawith USF participationTG↗
2026-07-10ES PS 110 kV "Mainaky"AR Crimeawith USF participationTG↗
2026-07-10ES PS 110 kV "Novoozerna"AR Crimeawith USF participationTG↗
2026-07-10ES PS 110 kV "Saky"AR Crimeawith USF participationTG↗
2026-07-10ES PS 35 kV "Medvedeve"AR Crimeawith USF participationTG↗
2026-07-11Electric substation PS 110 kV "Berehove"AR Crimeawith USF participationTG↗
2026-07-11PS 110 kV "Mainaky"AR Crimeawith USF participationTG↗
2026-07-11PS 110 kV "Novoozerna"AR Crimeawith USF participationTG↗
2026-07-11PS 110 kV "Saky"AR Crimeawith USF participationTG↗
2026-07-11PS 36 kV "Medvedeve"AR Crimeawith USF participationTG↗
2026-07-13PS 110 kV "Zymyne"AR Crimeawith USF participationTG↗
2026-07-13PS 110 kV "Kovylne"AR Crimeawith USF participationTG↗
2026-07-13PS 110 kV "Rubizhne"Luhansk oblastwith USF participationTG↗
2026-07-13PS 220 kV "Komysh-Burun"AR Crimeawith USF participationTG↗
2026-07-13PS 220 kV "Lysychanska"Luhansk oblastwith USF participationTG↗
2026-07-13PS 330 kV "Zoria"AR Crimeawith USF participationTG↗
2026-07-18ES PS 110 kV "Kerchenska"AR Crimeawith USF participationTG↗
2026-07-18ES PS 110 kV "Koktebel"AR Crimeawith USF participationTG↗
2026-07-18ES SS 220 kV "Azovska"Donetsk oblastwith USF participationTG↗
2026-07-18ES SS 220 kV "Komysh-Burun"AR Crimeawith USF participationTG↗
2026-07-18ES SS 220 kV "Chornomorska"AR Crimeawith USF participationTG↗
2026-07-19ES SS 110 kV "Darsan"AR Crimeawith USF participationTG↗
2026-07-19ES SS 110 kV "Zorya"AR Crimeawith USF participationTG↗
2026-07-19ES SS 110 kV "Kapsel"AR Crimeawith USF participationTG↗
2026-07-19ES PS 110 kV "Koktebel"AR Crimeawith USF participationTG↗
2026-07-19ES SS 110 kV "Lenino"AR Crimeawith USF participationTG↗
2026-07-19ES SS 110 kV "Solyana"AR Crimeawith USF participationTG↗
2026-07-19ES SS 150 kV "Berdianska"AR Crimeawith USF participationTG↗
2026-07-19ES SS 220 kV "Azovska"AR Crimeawith USF participationTG↗
2026-07-19ES SS 220 kV "Nansosna-3"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 110 kV "Alushta"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 110 kV "Artek"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 110 kV "Blyzhni Kamyshi"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 110 kV "Dozorne"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 110 kV "Zhaivoronky"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 110 kV "Kapsel"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 110 kV "Luchova"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 110 kV "Nyva"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 110 kV "Novoozerna"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 110 kV "Perevalne"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 110 kV "Skvortsove"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 110 kV "Sudak"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 220 kV "Bakhchysarai"AR Crimeawith USF participationTG↗
2026-07-27Electric Substation SS 330 kV "Simferopolska"AR Crimeawith USF participationTG↗
2026-07-29Electric Substation SS 110 kV "Albatros"AR Crimeawith USF participationTG↗
2026-07-29Electric Substation SS 110 kV "Kercheska"AR Crimeawith USF participationTG↗
2026-07-29Electric Substation SS 110 kV "Moinaky"AR Crimeawith USF participationTG↗
2026-07-29Electric Substation SS 110 kV "Sklo"AR Crimeawith USF participationTG↗
2026-07-29Electric Substation SS 220 kV "Kairka"Kherson Oblastwith USF participationTG↗
2026-07-29Electric Substation SS 220 kV "Marianivka"AR Crimeawith USF participationTG↗
2026-07-29Electric Substation SS 220 kV "Feodosiiska"AR Crimeawith USF participationTG↗
2026-07-29Electric Substation SS 330 kV "Akvilon"Kherson Oblastwith USF participationTG↗
2026-07-29Electric Substation SS 330 kV "Pershokostiantynivka"Kherson Oblastwith USF participationTG↗
2026-08-02Electric Substation SS 110 kV "Volodarska"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-02Electric Substation SS 110 kV "Makorty"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-02Electric Substation SS 110 kV "Misto-11"Donetsk oblastwith USF participationTG↗
2026-08-02Electric Substation PS 110 kV "Topolyne"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-02Electric Substation PS 150 kV "Henichesk"Kherson Oblastwith USF participationTG↗
2026-08-02Electric Substation PS 150 kV "Henichesk" (repeated)Kherson Oblastwith USF participationTG↗
2026-08-02Electric Substation PS 150 kV "Novoолeksiyivka"Kherson Oblastwith USF participationTG↗
2026-08-02Electric Substation PS 220 kV "Azovska-220"Donetsk oblastwith USF participationTG↗
2026-08-02Electric Substation PS 330 kV "Myrna"Donetsk oblastwith USF participationTG↗
2026-08-03Gas Distribution Station "Lymane"AR Crimeawith USF participationTG↗
2026-08-03Gas Distribution Station "Nyva"AR Crimeawith USF participationTG↗
2026-08-03Electric Substation SS 110 kV "Volodarska"Donetsk oblastwith USF participationTG↗
2026-08-03Electric Substation PS 110 kV "Misto-12"Donetsk oblastwith USF participationTG↗
2026-08-03Electric Substation PS 110 kV "NS-2"Donetsk oblastwith USF participationTG↗
2026-08-03Electric Substation PS 110 kV "Topolyne"Donetsk oblastwith USF participationTG↗
2026-08-03Electric Substation PS 750 kV "Pivdennodonbaska"Donetsk oblastwith USF participationTG↗
2026-08-05Gas Distribution Station "Natashyne"AR Crimeawith USF participationTG↗
2026-08-05Electric Substation SS 110 kV "Misto-11"Donetsk oblastwith USF participationTG↗
2026-08-05Electric Substation PS 110 kV "NS-2"Donetsk oblastwith USF participationTG↗
2026-08-05Electric Substation PS 110 kV "Topolyne"Donetsk oblastwith USF participationTG↗
2026-08-05Electric Substation PS 150 kV "Azovselmash"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-05Electric Substation PS 150 kV "Melitopol"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-05Electric Substation PS 150 kV "Tymofiyivka"Kherson Oblastwith USF participationTG↗
2026-08-05Electric Substation PS 330 kV "Myrna"Donetsk oblastwith USF participationTG↗
2026-08-05Electric Substation PS 750 kV "Pivdennodonbaska"Donetsk oblastwith USF participationTG↗
2026-08-05Traction Substation 150 kV "Yakymivka-Tranzytna"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-07Electric Substation SS 110 kV "Misto-11"Donetsk oblastwith USF participationTG↗
2026-08-07Electric Substation PS 330 kV "Zorya"Donetsk oblastwith USF participationTG↗
2026-08-07Electric Substation PS 330 kV "Myrna"Donetsk oblastwith USF participationTG↗
2026-08-14Gas Distribution Station GRS-1 "Mariupol"Donetsk oblastwith USF participationTG↗
2026-08-14Electric Substation PS 110 kV "Illich"Donetsk oblastwith USF participationTG↗
2026-08-14Electric Substation SS 110 kV "Volodarska"Donetsk oblastwith USF participationTG↗
2026-08-14Electric Substation PS 110 kV "GPP" (repeated)Zaporizhzhia Oblastwith USF participationTG↗
2026-08-14Electric Substation PS 110 kV "Lazurna"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-14Electric Substation PS 110 kV "Misto-3"Donetsk oblastwith USF participationTG↗
2026-08-14Electric Substation PS 110 kV "NS-2"Donetsk oblastwith USF participationTG↗
2026-08-14Electric Substation PS 110 kV "Fakel"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-14Electric Substation PS 150 kV "Andriyivka"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-14Electric Substation PS 150 kV "Berdyanska"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-14Electric Substation PS 150 kV "Berdyanska" (repeated)Zaporizhzhia Oblastwith USF participationTG↗
2026-08-14Electric Substation PS 150 kV "Botiyevska"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-14Electric Substation PS 150 kV "Bilmak"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-14Electric Substation PS 150 kV "Morska"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-14Electric Substation PS 150 kV "Prymorska"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-14Electric Substation PS 150 kV "Chernihivka"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-22Electric PS 500 kV "Taman"Krasnodar Kraiwith USF participationTG↗
2026-08-22PS 110 kV "Alupka"AR Crimeawith USF participationTG↗
2026-08-22PS 110 kV "Volodarska"Donetsk oblastwith USF participationTG↗
2026-08-22SS 110 kV "Haspra"AR Crimeawith USF participationTG↗
2026-08-22SS 110 kV "Zorya"AR Crimeawith USF participationTG↗
2026-08-22SS 110 kV "Koktebel"AR Crimeawith USF participationTG↗
2026-08-22SS 110 kV "Malorichenske"AR Crimeawith USF participationTG↗
2026-08-22SS 110 kV "Prymorska"Donetsk oblastwith USF participationTG↗
2026-08-22SS 110 kV "Styla"Donetsk oblastwith USF participationTG↗
2026-08-22SS 110 kV "Tavria"AR Crimeawith USF participationTG↗
2026-08-22SS 110 kV "Topolyne"Donetsk oblastwith USF participationTG↗
2026-08-22SS 110 kV "Sharkha"AR Crimeawith USF participationTG↗
2026-08-22SS 150 kV "Makorti"Zaporizhzhia Oblastwith USF participationTG↗
2026-08-22SS 330 kV "Zakhidno-Krymska"AR Crimeawith USF participationTG↗
2026-08-22SS 330 kV "Khartsyzka"Donetsk oblastwith USF participationTG↗
2026-08-22SS 500 kV "Peremoha"Donetsk oblastwith USF participationTG↗
2026-08-28Electrical Substation SS 110 kV "VAOK"Donetsk oblastwith USF participationTG↗
2026-08-28Electrical Substation SS 110 kV "Voikove Traction"Donetsk oblastwith USF participationTG↗
2026-08-28Electrical Substation SS 110 kV "Dmytrivka"Donetsk oblastwith USF participationTG↗
2026-08-28Electrical Substation SS 110 kV "Kovylne"AR Crimeawith USF participationTG↗
2026-08-28Electrical Substation SS 110 kV "Krainie"AR Crimeawith USF participationTG↗
2026-08-28Electrical Substation SS 110 kV "Luhansk"Luhansk oblastwith USF participationTG↗
2026-08-28Electrical Substation SS 110 kV "Novoazovska"Donetsk oblastwith USF participationTG↗
2026-08-28Electric Substation SS 110 kV "Novoozerna"AR Crimeawith USF participationTG↗
2026-08-28Electrical Substation SS 110 kV "Novotroitska"Donetsk oblastwith USF participationTG↗
2026-08-28Electrical Substation SS 110 kV "Pavlivka"Donetsk oblastwith USF participationTG↗
2026-08-28Electrical Substation SS 110 kV "YuDV"Donetsk oblastwith USF participationTG↗
2026-08-28Electrical Substation SS 150 kV "Henichenska"Kherson Oblastwith USF participationTG↗
2026-08-28Electric Substation PS 150 kV "Tymofiyivka"Kherson Oblastwith USF participationTG↗
2026-08-28Electrical Substation SS 220 kV "Alchevska"Luhansk oblastwith USF participationTG↗
2026-08-28Electrical Substation SS "Nyva"AR Crimeawith USF participationTG↗
2026-08-28Luhansk TPP "Shchastia"Luhansk oblastwith USF participationTG↗
2026-09-10Gas Distribution Station GDS "Veresaievo"AR Crimea—TG↗
2026-09-10Gas Distribution Station GDS "Nyzhnohirskyi"AR Crimea—TG↗
2026-09-10Electrical Substation "Morska"Kherson Oblast—TG↗
2026-09-10Electrical Substation SS 150 kV "Henichenska" (repeat)Kherson Oblast—TG↗
2026-09-10SS 110 kV "DKhMZ-2"Donetsk oblast—TG↗
2026-09-10SS 110 kV "Novoazovska"Donetsk oblast—TG↗
2026-09-10SS 110 kV "Novotroitska"Donetsk oblast—TG↗
2026-09-10SS 110 kV "Pavlopilska"Donetsk oblast—TG↗
2026-09-10SS 150 kV "Henichenska"Kherson Oblast—TG↗
2026-09-10SS 220 kV "Kirovska-220"Luhansk oblast—TG↗
2026-09-10SS 330 kV "Mykhailivska"Luhansk oblast—TG↗
2026-09-10SS 330 kV "Mykhailivska" (repeat)Luhansk oblast—TG↗
2026-09-10SS 330 kV "Pershokoatyantinovka"Kherson Oblast—TG↗
2026-09-10Traction substation TSS 110 kV "Volnovakha-Traction"Donetsk oblast—TG↗
2026-09-10Traction substation TSS 110 kV "Kalchyk-Traction"Donetsk oblast—TG↗
2026-09-10Traction substation TSS 110 kV "Karan"Donetsk oblast—TG↗
2026-09-10Traction substation TSS 110 kV "Olenivka traction"Donetsk oblast—TG↗
2026-09-10Traction substation TSS 150 kV "Sokolohirna"Zaporizhzhia Oblast—TG↗
2026-09-23GDS "Klepynine"AR Crimea—TG↗
2026-09-23Gas distribution station GDS "Orlivka"AR Crimea—TG↗
2026-09-23Electrical substation SS 220 kV "Krasnodarska"Luhansk oblast—TG↗
2026-09-23SS 110 kV "Artemivska"Luhansk oblast—TG↗
2026-09-23SS 110 kV "Bilovodska"Luhansk oblast—TG↗
2026-09-23SS 110 kV "Kotlyarevska"Donetsk oblast—TG↗
2026-09-23SS 220 kV "Amvrosiivka"Donetsk oblast—TG↗
2026-09-23SS "Misto-11"Donetsk oblast—TG↗
2026-10-04Electrical substation SS 35 kV "Slovyanske"AR Crimea—TG↗
2026-10-04Electrical substation SS 500 kV "Peremoha"Luhansk oblast—TG↗
2026-10-04SS 110 kV "Zasyadko"Donetsk oblast—TG↗
2026-10-04SS 110 kV "Zasiadko" (repeat)Donetsk oblast—TG↗
2026-10-04SS 110 kV "Nyzhnohirsk"AR Crimea—TG↗
2026-10-04SS 110 kV "Poshtovyi HPP-1"Donetsk oblast—TG↗
2026-10-04SS 110 kV "Pryvilne"AR Crimea—TG↗
2026-10-04SS 110 kV "Pivnichna"Donetsk oblast—TG↗
2026-10-04SS 110 kV "Styla"Donetsk oblast—TG↗
2026-10-04SS 220 kV "Krasnoperekopsk"AR Crimea—TG↗
2026-10-04SS 220 kV "Smolianka"Donetsk oblast—TG↗
2026-10-04SS 220 kV "Soda"AR Crimea—TG↗
2026-10-04SS 330 kV "Zakhidno-Krymska"AR Crimea—TG↗
2026-10-04PS 330 kV "Zoria"Donetsk oblast—TG↗
2026-10-04SS 330 kV "Ostrivska"AR Crimea—TG↗
2026-10-04SS 330 kV "Pershokoatyantinovka"Kherson Oblast—TG↗
2026-10-04SS 330 kV "Chaikino"Donetsk oblast—TG↗
2026-10-04SS 35 kV "Berezivka"AR Crimea—TG↗
2026-10-04SS 35 kV "Vyshneva"AR Crimea—TG↗
2026-10-04SS 35 kV "Voinka"AR Crimea—TG↗
2026-10-04SS 35 kV "Krasnosilska"AR Crimea—TG↗
2026-10-04SS 35 kV "Kumove"AR Crimea—TG↗
2026-10-04SS 35 kV "Medvedeve"AR Crimea—TG↗
2026-10-04SS 35 kV "Mykhailivka"AR Crimea—TG↗
2026-10-04SS 35 kV "Slovianske" (repeat)AR Crimea—TG↗
2026-10-04SS 35 kV "Chornomorske"AR Crimea—TG↗
2026-10-04SS "DE-09"Donetsk oblast—TG↗

Group summaries

Besides named targets, the USF published periodic summaries without breakdown by substation names — 169 such entries for July–October 2026 (until 04.10):

DateObjectRegionSource
2026-07-02Electric substation PS 110 kV RodnikoveAR CrimeaTG↗
2026-07-02Electric substation PS 220 kV DonuzlavAR CrimeaTG↗
2026-07-02Electric substation PS 220 kV FeodosiiskaAR CrimeaTG↗
2026-07-02Electric substation PS 35 kV OzernenskaAR CrimeaTG↗
2026-07-03Electrical substation SS 110 kV BilohirskAR CrimeaTG↗
2026-07-03Electrical substation SS 110 kV SakyAR CrimeaTG↗
2026-07-03Electrical substation SS 110 kV TavriaAR CrimeaTG↗
2026-07-03Gas compressor station KlyuchiAR CrimeaTG↗
2026-07-05Electric substation PS 110 kV KovylneAR CrimeaTG↗
2026-07-05PS 110 kV ZymneAR CrimeaTG↗
2026-07-05PS 110 kV NyvaAR CrimeaTG↗
2026-07-05PS 110 kV SakyAR CrimeaTG↗
2026-07-05PS 110 kV StepneAR CrimeaTG↗
2026-07-05PS 110 kV TraktoveAR CrimeaTG↗
2026-07-05PS 150 kV HenicheskKherson OblastTG↗
2026-07-05PS 150 kV OveriyanivkaKherson OblastTG↗
2026-07-05PS 220 kV BakhchysaraiAR CrimeaTG↗
2026-07-05PS 330 kV Zakhidno-KrymskaAR CrimeaTG↗
2026-07-05PS 35 kV SlovianskeAR CrimeaTG↗
2026-07-05PS 35 kV Yany KapuAR CrimeaTG↗
2026-07-06SS 330 kV SimferopolAR CrimeaTG↗
2026-07-07Gas compressor station TasunovoAR CrimeaTG↗
2026-07-07Electrical substation SS 110 kV MytiaievoAR CrimeaTG↗
2026-07-07Electrical substation SS 110 kV SakyAR CrimeaTG↗
2026-07-07Electrical substation SS 220 kV Komysh-BurunAR CrimeaTG↗
2026-07-07Electrical substation SS 330 kV Zahidno-KrymskaAR CrimeaTG↗
2026-07-07Electrical substation SS 35/10 kV ChkaloveAR CrimeaTG↗
2026-07-08Electrical substation KalynoveLuhansk oblastTG↗
2026-07-08Electrical substation NovotroitskeAR CrimeaTG↗
2026-07-08Electrical substation TroitskeLuhansk oblastTG↗
2026-07-08Electrical substations (6 units night of 8 July, 50 units for 01-08 July)AR CrimeaTG↗
2026-07-11Electrical substationDonetsk oblastTG↗
2026-07-11Electrical substationLuhansk oblastTG↗
2026-07-11Electrical substationLuhansk oblastTG↗
2026-07-11Electrical substationDonetsk oblastTG↗
2026-07-11Saky TPPAR CrimeaTG↗
2026-07-13Electrical substationDonetsk oblastTG↗
2026-07-13Electrical substationDonetsk oblastTG↗
2026-07-13Electrical substationZaporizhzhia OblastTG↗
2026-07-18Electrical substationLuhansk oblastTG↗
2026-07-18Electrical substationLuhansk oblastTG↗
2026-07-18Electrical substationLuhansk oblastTG↗
2026-07-18Electrical substationDonetsk oblastTG↗
2026-07-18Electrical substationLuhansk oblastTG↗
2026-07-18Electrical substationKherson OblastTG↗
2026-07-19Electrical substationKherson OblastTG↗
2026-07-19Electrical substationLuhansk oblastTG↗
2026-07-19Electrical substationDonetsk oblastTG↗
2026-07-19Electrical substationLuhansk oblastTG↗
2026-07-20Electrical substationKherson OblastTG↗
2026-07-20Electrical substationDonetsk oblastTG↗
2026-07-20Electrical substationLuhansk oblastTG↗
2026-07-20Electrical substationLuhansk oblastTG↗
2026-07-20Electrical substationLuhansk oblastTG↗
2026-07-20Electrical substationDonetsk oblastTG↗
2026-07-20Electrical substationZaporizhzhia OblastTG↗
2026-07-20Electrical substation SS 110 kV DarsanAR CrimeaTG↗
2026-07-20Electrical substation SS 110 kV ZoriaAR CrimeaTG↗
2026-07-20Electrical substation SS 110 kV KapselAR CrimeaTG↗
2026-07-20Electrical substation SS 110 kV KoktebelAR CrimeaTG↗
2026-07-20Electrical substation SS 110 kV LeninoAR CrimeaTG↗
2026-07-20Electrical substation SS 110 kV LuchysteAR CrimeaTG↗
2026-07-20Electrical substation SS 110 kV MorskeAR CrimeaTG↗
2026-07-20Electrical substation SS 110 kV PryvitneAR CrimeaTG↗
2026-07-20Electrical substation SS 110 kV SolianaAR CrimeaTG↗
2026-07-20Electrical substation SS 150 kV BerdianskaAR CrimeaTG↗
2026-07-20Electrical substation SS 220 kV AzovskaAR CrimeaTG↗
2026-07-20Electrical substation SS 220 kV Nasosna-3AR CrimeaTG↗
2026-07-20Electrical substations (7 units, operation Crimean circuit breaker off)AR CrimeaTG↗
2026-07-22Electrical substationAR CrimeaTG↗
2026-07-22Electrical substationKherson OblastTG↗
2026-07-22Electrical substationZaporizhzhia OblastTG↗
2026-07-22Electrical substation SS 110 kV AlupkaAR CrimeaTG↗
2026-07-22Electrical substation SS 110 kV AlushtaAR CrimeaTG↗
2026-07-22Electrical Substation PS 110 kV HaspraAR CrimeaTG↗
2026-07-22Electrical substation SS 110 kV DarsanAR CrimeaTG↗
2026-07-22Electrical Substation PS 110 kV ZymyneAR CrimeaTG↗
2026-07-22Electrical substation SS 110 kV ZoriaAR CrimeaTG↗
2026-07-22Electrical substation SS 110 kV LuchysteAR CrimeaTG↗
2026-07-22Electrical Substation PS 110 kV MassandraAR CrimeaTG↗
2026-07-22Electrical Substation PS 110 kV YaltaAR CrimeaTG↗
2026-07-22Electrical substation SS 150 kV BerdianskaZaporizhzhia OblastTG↗
2026-07-24Electrical substationDonetsk oblastTG↗
2026-07-24Electrical substationDonetsk oblastTG↗
2026-07-24Electrical Substation PS 110 kV BerehoveAR CrimeaTG↗
2026-07-24Electrical Substation PS 110 kV VeseleAR CrimeaTG↗
2026-07-24Electrical Substation PS 110 kV VoskhodAR CrimeaTG↗
2026-07-24Electrical Substation PS 110 kV HaspraAR CrimeaTG↗
2026-07-24Electrical Substation PS 110 kV HlibivkaAR CrimeaTG↗
2026-07-24Electrical substation SS 110 kV KoktebelAR CrimeaTG↗
2026-07-24Electrical Substation PS 110 kV KrainyeAR CrimeaTG↗
2026-07-24Electrical Substation PS 110 kV MalorichenskeAR CrimeaTG↗
2026-07-24Electrical Substation PS 110 kV Nasosna-16AR CrimeaTG↗
2026-07-24Electrical Substation PS 110 kV OleksiivkaAR CrimeaTG↗
2026-07-24Electrical Substation PS 110 kV SkvortsovoAR CrimeaTG↗
2026-07-24Electrical Substation PS 110 kV SudakAR CrimeaTG↗
2026-07-24Electrical Substation PS 110 kV KholodylnykAR CrimeaTG↗
2026-07-24Electrical Substation PS 110/10 kV Blyzhni KamyshiAR CrimeaTG↗
2026-07-24Electrical Substation PS 110/10 kV HurzufAR CrimeaTG↗
2026-07-24Electrical Substation PS 110/10 kV YaltaAR CrimeaTG↗
2026-07-24Electrical Substation PS 110/35 kV PrymorskyiAR CrimeaTG↗
2026-07-27Electrical substationLuhansk oblastTG↗
2026-07-27Electrical substationKherson OblastTG↗
2026-07-27Electrical substationKherson OblastTG↗
2026-07-27Electrical substationDonetsk oblastTG↗
2026-07-29Electrical substationLuhansk oblastTG↗
2026-08-02Electrical substationZaporizhzhia OblastTG↗
2026-08-02Energy infrastructure at Zuivska TPPDonetsk oblastTG↗
2026-08-05Electrical substationLuhansk oblastTG↗
2026-08-05Electrical Substation 150 kV Botiyevska WPPZaporizhzhia OblastTG↗
2026-08-05Electrical Substation at Zuivska TPPDonetsk oblastTG↗
2026-08-07Electrical substationZaporizhzhia OblastTG↗
2026-08-07Electrical substationLuhansk oblastTG↗
2026-08-07Electrical substationLuhansk oblastTG↗
2026-08-07Electrical substationDonetsk oblastTG↗
2026-08-07Electrical substationDonetsk oblastTG↗
2026-08-14Balaklava TPPAR CrimeaTG↗
2026-08-14Electrical substationLuhansk oblastTG↗
2026-08-14Electrical substationLuhansk oblastTG↗
2026-08-14Electrical substationLuhansk oblastTG↗
2026-08-14Electrical substationDonetsk oblastTG↗
2026-08-14Electrical substationDonetsk oblastTG↗
2026-08-14Electrical substationZaporizhzhia OblastTG↗
2026-08-14Electrical substationDonetsk oblastTG↗
2026-08-14Electrical substationZaporizhzhia OblastTG↗
2026-08-14Electrical substationLuhansk oblastTG↗
2026-08-22Gas turbine power plantAR CrimeaTG↗
2026-08-22Gas turbine power plantAR CrimeaTG↗
2026-08-22Electrical substationAR CrimeaTG↗
2026-08-22Electrical substationLuhansk oblastTG↗
2026-08-22Electrical substationLuhansk oblastTG↗
2026-08-22Electrical substationZaporizhzhia OblastTG↗
2026-08-22Electrical substationLuhansk oblastTG↗
2026-09-10Electrical substationLuhansk oblastTG↗
2026-09-10Electrical substationLuhansk oblastTG↗
2026-09-10Electrical substationDonetsk oblastTG↗
2026-09-10Electrical substationDonetsk oblastTG↗
2026-09-10Electrical substationLuhansk oblastTG↗
2026-09-10Electrical substationLuhansk oblastTG↗
2026-09-10Luhanska TPPLuhansk oblastTG↗
2026-09-23Electrical substationDonetsk oblastTG↗
2026-09-23Electrical substationLuhansk oblastTG↗
2026-09-23Electrical substationDonetsk oblastTG↗
2026-09-23Electrical substationLuhansk oblastTG↗
2026-09-23Electrical substationDonetsk oblastTG↗
2026-09-23Electrical substationLuhansk oblastTG↗
2026-09-23Electrical substationDonetsk oblastTG↗
2026-09-23Electrical substationLuhansk oblastTG↗
2026-09-23Electrical substationDonetsk oblastTG↗
2026-09-23Electrical substationLuhansk oblastTG↗
2026-09-23Electrical substationLuhansk oblastTG↗
2026-09-23Electrical substationDonetsk oblastTG↗
2026-09-23Electrical substationLuhansk oblastTG↗
2026-09-23Electrical substationLuhansk oblastTG↗
2026-09-23Electrical substationLuhansk oblastTG↗
2026-09-23Electrical substationZaporizhzhia OblastTG↗
2026-10-04Electrical substationLuhansk oblastTG↗
2026-10-04Electrical substationZaporizhzhia OblastTG↗
2026-10-04Electrical substationLuhansk oblastTG↗
2026-10-04Electrical substationZaporizhzhia OblastTG↗
2026-10-04Electrical substationDonetsk oblastTG↗
2026-10-04Electrical substationDonetsk oblastTG↗
2026-10-04Electrical substationZaporizhzhia OblastTG↗
2026-10-04Electrical substationZaporizhzhia OblastTG↗
2026-10-04Electrical substationDonetsk oblastTG↗
2026-10-04Electrical substationDonetsk oblastTG↗
2026-10-04Electrical substationLuhansk oblastTG↗
2026-10-04Electrical substationLuhansk oblastTG↗
2026-10-04Electrical substationZaporizhzhia OblastTG↗
"East-Vyo" — new branch (28.08.2026)

On 28 August 2026 the USF Commander announced the opening of a geographical "branch" of "Crimean Switch off" in occupied Luhansk region — transferring energy pressure beyond Crimea and southern TOT. Targets of this direction are included in the campaign's overall count (456 as of 03.10.2026, post №2872), the channel does not maintain a separate counter for "East-Vyo".

Get used to blackouts, "worms". Turns out two can play this game. Winter will be early and dark. In Crimea too.— Robert Brovdi ("Magyar"), Commander of the USF, 2026-08-28

First declared objects of the direction — Luhanska TPP "Shchastya" and substation "Alchevska"; the same day +21 energy nodes were declared (315 since operation start).

Sources: Telegram @robert_magyar · Ukrinform

Commander's wording presents the new direction as symmetrical response to rf energy terror against Ukrainian cities — the thesis is documented as verbatim quote, without own interpretation.

In September summaries (post №2841, 22.09.2026) 13 out of 38 reported targets of the second decade — in occupied Luhansk region; the channel accounts for them within the overall campaign count, without separate "East-Off" counter.

Sources: Telegram @robert_magyar, 23.09 (for the second decade of September)

Effect

Stated campaign goal — to de-energize occupied Crimea to the point of unusability as a military staging ground: "leave the worm without sources of war financing, weapons production facilities, cut logistics to the front, remove air defense and make the peninsula unusable as a military staging ground".

Sources: Telegram @robert_magyar, 01.08 (monthly summary)

"Rubicon" and 51st Air Defense Division pulled from the front

On July 18, 2026, the USF Commander stated that rf redeployed up to 200 crews of the "Rubicon" drone unit from the front line to protect the "shadow fleet" (one crew per vessel), as well as units of the 51st Air Defense Division and an anti-aircraft missile regiment of the Black Sea Fleet.

Sources: Telegram @robert_magyar · Kyiv Independent

"Kuban–Crimea" energy bridge under indefinite pressure

Main campaign target — the "Kuban–Crimea" electricity transfer node (Hlazivka settlement, AR Crimea), through which the occupied peninsula receives power from mainland rf. Repeated strikes on the node throughout July — part of an indefinite operation, not a one-time action.

Sources: Telegram @robert_magyar, 08.07

International press — shift in approach to energy strikes

On 29.07.2026, the Financial Times published a comment by the USF Commander that Ukraine is changing its approach to strikes on Russian energy infrastructure — the context specifically of the energy vector of the campaign.

Sources: Financial Times, 29.07

Blackouts open up air defense (link to "AD-Fall")

According to the USF Commander's statement (14.08.2026), blackouts of stationary radars and other enemy air defense elements through strikes on energy nodes disrupt the sky defense system and open the way for further strikes by USF Birds — this is the publicly declared tactical link between the "Crimean Switch off" campaign and the "AD-Fall" campaign. Euromaidan Press repeated this thesis in its analysis of August results on 06.09.2026.

Sources: Telegram @robert_magyar · Euromaidan Press

Methodology

All figures on this page are declared data from the official channel of USF Commander Robert Brovdi (daily and summary posts, Telegram). Each table row above is a separate declared target with a link to the primary source. The summary figure 166 — final summary from 01.08.2026 for the period 01–31.07.2026; replaces the interim snapshot of 164 from 29.07.2026 and is used throughout this page.

August update (01.09.2026). Campaign slice for August — 168, cumulative from 06.07.2026 — 349 (final post of the USF Commander №2782).

September update (01.10.2026). Campaign snapshot for September — +82 per infographic of summary post №2863; channel series — 374 on 09.09 (post №2805) → 412 on 22.09 (post №2841) → 456 as of 03.10.2026 (post №2872).

October update (02.11.2026). Last channel value — 456 as of 03.10.2026 (post №2872); no later values or facility lists in the Commander's posts.